| Historical notes: | Lithgow's association with its iron and steel works was another of this city's big manufacturing eras. Its Iron and Steel works commenced in October 1875 when the first iron smelting took place. Ore had been discovered on Eskbank land which was then owned by Enoch Hughes. The foundry was erected nearby after Hughes convinced James Rutherford of Cobb & Co., fame from Bathurst. Ironically the other principal shareholders were the NSW Minister for Public Woriks, the Hon. John Sutherland and Dan WIlliams, an engineer from Canada who worked on the Zig Zag railway prooject. The Eskbank Ironworks then consisted of a blast furnace, foundry and two bar rolling mills with the necessary fitting and smiths' shops. About 20,000 tons of pig iron was made initially from local ores, which was converted into rails and bars. Work was carried on intermittently, until it was decided to pull down the blast furnace and convert the castings into merchant iron (McRae, 2016, 3).
In May 1880 in the 'Lithgow Report' it stated that the Eskbank Ironworks were working at the rate of four miles of rails per week. The new rails stood the test of forty tons, the required standard being thirty tons. The blast furnace was in full swing and 100 tons per week of rion was anticipated (ibid, 2016, 3).
The Lithgow Blast Furnace was erected by William Sandford in 1906-1907, a short distance from the Eskbank Colliery which he had purchased outright in 1892. The construction of this later furnace over 1 km away from the Colliery was widely criticised, but its proximity to the railway and its size, providing scope for expansion, made it an understandable choice. It was constructed for the sole purpose of smelting iron from ore. It is a popular misconception that the site was also an ironworks. Indeed the Eskbank Colliery furnace, which had been operating since 1875, is often confused with Sandford's later furnace (Cremin and Jack 1986: 8-35).
After a layoff the mills at the Eskbank Ironworks were restarted on Monday 30 July 1894. The old system had been discarded and the mills had now commenced on a partially co-operative principle, which it was expected would cheapen production and give better results generally. During the cessation of work the plant was added to and imporoved, in this way the sheet mill now starts equipped to produce nearly double its former product. An order for 100 tons of spike iron, to be supplied at the rate of 10 tons weekly, had been obtained from the Railway Commissioners. The company soon found themselves with an overdraft of about 60,000 pounds and had decided on closing the works when Sandford took them on lease in 1885. He added mill after mill, with powerful shears, furnaces, boilers and rollers, so that now the mills were fully equipped for the work they had to do. Outpot for all classes of finished iron and steel for the three years ending 31/12/1901 averaged over 7000 tons per annum. It did not cover more than a small percentage of what was imported into Sydney (ibid, 2016, 3).
The works and sidings occupied a space of about 12 acres, situated between the Main Western Railway Line and Farmer's Creek, being connected with the main line at Eskbank Station, with sidings all round the works. Sand for the works was obtained from Farmer's Creek, close by, and loam for the foundry from a paddock adjoining the works. Within the ironworks' fence is a colliery adit, where the coal was drawn out by an engine, and the same skips drawn around the works, so that coal was only handled once, into the skips; and the same skips were tipped into the furnace bins in the ironworks. Coal was thus used fresh from the colliery, and bore comparison in heating qualities with most of the English coals. On the siding to the works was situated the steam sawmills, where timber of any ordinary size coud be cut and delivered to the works (ibid, 2016, 3).
To heat the iron for the mill, four large furnaces were used, each capable of heating from 5-6 tons of iron per shift. Attached were large horizontal boilers for raising steam by the waste-head from the furnaces. There was a great deal of equipment on site including immense Cornish boilers, weighing 22 tons for raising steam by the waste heat from the furnaces. There was a 1.5 ton steam hammer, massive shears for cutting up rails into lengths, a large gantry, 36" horizontal condensing 175 horse power engine and giant fly-wheels with 30' diameters, weighing 40 tons (ibid, 2016, 3).
The No. 2 Sheet Mill had a 35 ton flywheel. In the fitting shops were lathes, screwing, drilling and punching machines, nut and bolt machines, and a complete spike-making machine, where spikes for the Railway Construction Department had been made the previous 3 years. The foundry department had two large travelling cranes, a large and small cupola and an air furnace. There was also a large Siemens melting furnace, for dealing with scrap, scrap and pig iron. IT was complete with a steam travelling crane capable of lifting 7 ton cast iron moulds and large wrought iron ladles. Cement used in the works was mostly made at the Cullen Bullen Company's lime and cement works, about 10 miles from Lithgow
There was another mill principally for rolling sheets for galvanising and corrugating sheets up to 12' long and 27 gauge (ibid, 2016, 3).
On 24 April 1901 Sandford organised a gala dinner to announce that he and his sone Esk had successfully tapped the first viable quantities of steel produced in Australia at the Eskbank Ironworks. He had been working Eskbank since the 1880s, and although tapping steel was a triumph, he was nearly exhausted by it. Sandford felt iron and steel were basic commodities and needed to be boosted, and tried every which way to protect and support his vennture. While Lithgow's coal miners were free traders, iron workers and their bosses were protectionists, so, to advance his cause, Sandford ran as a protectionist against Joseph Cook in the 1901 federal parliamentary election. He then tried to convicen the NSW government to take over the works.
Finally, when a tender for steel and iron supply became available he bribed three parliamentarians, including WIlliam Holman, to win the contract. Part of that deal included the construction of a blast furnace, to enable production of pig iron for steel. Sandford complied.
The Blast Furnace was 'blown in' on 13 May 1907. It was Sandford's proudest moment and won him the title of the father of the Australian steel industry. His relations with workers were relatively harmonious and beneficient and the Eskbank estate was, to him, a satisfyingly noisy and smoky place. However behind the scenes, Sandford was financially and mentally strained. He could not raise capital but was unwilling to cede his management to external investors such as John Lysagth Ltd., and although Charles Hoskins and his brother George looked at the plant, they pulled out when they saw the state of the books.
The Commercial Banking Company of Sydney, which had underwritten the operation, foreclosed on the ironworks on 9 December 1907, although it kept the Blast Furnace running. With 700 out of work, the Premier invited the Hoskins brothers to take over the Lithgow iron and steelworks. Althought he complicated deal ensured Sandford's debts were paid and he received enough money to guarantee his financial security, he was devastated and felt deceived by Charles Hoskins. His parting with the Lithgow community was sad for him, his wife Caroline, the workers and their community (McKillop, 2006, online at Lithgow.com/historyavenue/1901_steel.html)
The furnace was officially opened by the premier of New South Wales on May 13, 1907. William Sandford Ltd. soon ran into financial trouble and could not fulfil its contract to supply the government with pig-iron, so in 1908 the company was purchased by Hoskins Bros, owners of the premier manufacturer of iron pipes in Australia. They made few initial alterations to the Blast Furnace, although the ironworks underwent substantial changes. The Hoskins also succeeded in having Sandford's government contract transferred to themselves and extended until the end of 1916. Their success prompted them to build 80 coke ovens and a second blast furnace at the eastern end of the site in 1913. The second furnace was a near replica of Sandford's original construction. Fifteen coke ovens were added shortly afterwards to cope with the extra fuel requirements.
The Hoskins were highly active in the development of the ironworking industry and staunchly opposed the growth of unionism (Cremin and Jack 1986: 8-35). The Hoskins were clear-sighted about the technological problems of the steel and ironworks, and the labour issues, and had considerable business acumen, but Charles Hoskins was impatient and imperious and provoked industrial unrest as soon as he set foot in Lithgow in 1908. He was also a protectionist, and although his negotiations with government over tariffs were never entirely successful, he did manage to get the Eskbank enterprise onto a solid footing before the surge in production caused by World War II (McKillop, op. cit, 2006/online).
The outbreak of WWI saw considerable expansion in operations, although Lithgow's monopoly on iron smelting was about to be seriously challenged by BHP, who opened their Newcastle plant in 1915. However, the opening of a Small Arms factory in Lithgow ensured that the Hoskins' works flourished. A great deal of their profit was ploughed back into the expansion of capacity at the steelworks. In 1923 a fifth blowing engine was added to the original furnace. At 400 tons, it was the largest in Australia.
In the mid 1920s, the decision was taken to move operations to Port Kembla, where the natural resource and transport network were more attractive. The Lithgow site was abandoned in 1928, although the last employees were dismissed in 1932 (Cremin and Jack 1986: 8-35).
The site was bought by the Lithgow City Council and was opened to the public as the The Lithgow Blast Furnace Park in 1988.
After considerable works were undertaken to improve site access, safety, facilities and interpretation the Blast Furnace Park was reopened to the public in May 2018. |