BOOS (Bondi Ocean Outfall Sewer)

Item details

Name of item: BOOS (Bondi Ocean Outfall Sewer)
Other name/s: Main Northern Ocean Outfall Sewer
Type of item: Built
Group/Collection: Utilities - Sewerage
Category: Sewage Tunnel
Location: Lat: -33.8857938956 Long: 151.2814698890
Primary address: Blair Street, Bondi, NSW 2026
Local govt. area: Waverley
Local Aboriginal Land Council: La Perouse

Boundary:

Within road reserves and 3 metres from edge of the tunnel. The physical and operational curtilage of the Main Northern Ocean Outfall Sewer includes the sewers, ventshafts, pumping stations and other associated structures.
All addresses
Street AddressSuburb/townLGAParishCountyType
Blair StreetBondiWaverley  Primary Address
Williams Park (Northern end)BondiWaverley  Alternate Address
Williams Park (Northern end)BondiWoollahra  Alternate Address

Owner/s

Organisation NameOwner CategoryDate Ownership Updated
Sydney WaterState Government 

Statement of significance:

The Main Northern Ocean Outfall, or Bondi Ocean Outfall Sewer (BOOS), was the first ocean outfall sewer of its type to be designed and built in the country. It is one of the most significant engineering structures in Australia. It was a marvel of surveying accuracy for its time. The surveying allowed for the lining of the sewer before the tunnelling was completed.

The BOOS reduced the volume of polluted waters entering the Harbour and improved the health of the city's residents by moving polluted waters off shore. The construction of the BOOS saw other advances in technology related to the removal of sewerage from the sewers, houses and water courses within the city. These included the improving design and construction of pumping stations to move the sewerage from low lying areas, construction and research into the safe removal of noxious gases from the sewers, better ways of treating raw effluent, advances in engineering methods and construction for tunnelling across waterways and many more.

The significance of the Sydney's sewerage systems primarily relates to its role in the growth of Sydney and the expansion of municipal services from the turn of the century to the present. The construction in these systems is evidenced in the sewage pumping stations, vents, pipes, tunnels and other associated works which display in their character, a gradual change in architectural style spanning the Federation, InterWar and Post War periods. Many of these systems are still in use today with little change to their original fabric. In addition, the development of the major sewerage systems also represented a major advance in the protection of public health of Sydney by reducing the discharge of sewage from inner city areas into Port Jackson.

The system includes the sewers, ventshafts, pumping stations and other associated structures. Many of these features are of aesthetic and cultural significance and have landmark values. Some of these items include nineteen of the first twenty pumping stations, large brick sewer vents at Bondi, Glebe, Hyde Park and Bellevue Hill. It also includes the construction of the cavern which later housed the treatment plant which began partial operation in 1953.
Date significance updated: 05 Nov 01
Note: The State Heritage Inventory provides information about heritage items listed by local and State government agencies. The State Heritage Inventory is continually being updated by local and State agencies as new information becomes available. Read the Department of Premier and Cabinet copyright and disclaimer.

Description

Designer/Maker: Public Works Department
Builder/Maker: Public Works Department
Construction years: 1880-1889
Physical description: The Bondi Scheme discharges at Ben Buckler at the Pacific Ocean near Bondi. It was constructed as an intercepting sewer to reduce the amount of sewage discharging to the Harbour via the earlier City Council sewers. The sewer rises from Ben Buckler to the major junction chamber at the corner of Oxford, Liverpool and College Streets, from which the main branch sewers extend to the City, Darlington, Newtown, Annandale, Leichhardt, Glebe and Balmain. Large sewers junctioning with the outfall sewer were constructed to provide reticulation for East Sydney, Paddington, Woollahra and Waverley. The Bondi sewer is a gravitational system and gradually rises as it extends inland. Consequently it can only serve land directly above itself. Therefore after the initial scheme was completed in 1889 a considerable portion of the sewage continued to flow into the Harbour. Over time low level pumping stations were added to collect sewage from such areas and pump it to the Bondi Sewer. The Bondi Sewer is oviform in shape and was constructed from brick. The dimensions of the main outfall are 2.4m x 2.2m and this reduces by decrements to 2.1m x 1.8m at the major Oxford and Liverpool Street junction. Other components of the sewer system include a number of large brick sewer ventshafts and Bondi Sewerage Treatment Plant
Date condition updated:10 May 00
Modifications and dates: The system was extended to Balmain and Newtown during the late 1890's.
Further information: See Ben Buckler Ventshaft, Bellevue Hill Sewer Ventshaft, The Obelisk, Glebe Sewer Ventshaft, Bondi sewerage Treatment Plant
Current use: Sewerage treatment
Former use: Aboriginal land, Sewerage treatment

History

Historical notes: Aboriginal Sydney:
When Captain Arthur Phillip and the First Fleet landed, first in Botany Bay and then in Port Jackson (Sydney Harbour), in January 1788, he was met by people who had lived on this land for many thousands of years. At least 1,500 people lived in the area between Botany Bay and Broken Bay and the intermediate coast (Attenbrow, n.d.)

There were two main languages spoken in the Sydney region - Darug and Tharawal. The Darug language had two main dialects - one spoken along the coast and the other in the hinterland (west of present-day Parramatta). Tharawal was spoken to the south of Botany Bay and as far west as the Georges River and possibly Camden (ibid, n.d.)

People belonged to small groups (territorial clans) through which they were spiritually related to specific tracts of land - these clans included the Gadigal, Wanngal, Gamaragal, Wallumedegal and Boromedegal. The suffix 'gal' denotes 'people of', thus, for example, the Gadigal were the people of Gadi (also spelled Cadigal and Cadi respectively) (ibid, n.d.).

The 'district of Gadi' was reported to have stretched from South Head west to 'the cove adjoining this settlement' (Darling Harbour) - an area that would have included Centennial, Moore and Queens Parks. Watkin Tench referred to the Gadigal as 'those who reside in the bay of Cadi'. The 'bay of Cadi' is probably Kutti, the Aboriginal place name recorded for present-day Watsons Bay, and the present name of a small beach in the bay (ibid, n.d.).

The Centennial Parklands Conservation Management Plan contains the following report that provides in depth detail of the pre-colonial history of the lands that are present day Centennial Parklands, which is where the text on this page comes from: Pre-colonial Aboriginal land and resource use in Centennial, Moore and Queens Parks - assessment of historical and archaeological evidence for Centennial Parklands Conservation Management Plan (ibid, n.d.).

Waverley:
Waverley took its name from the title of a book by the famous Scottish author and poet, Sir Walter Scott. Its connection with the suburb of Waverley comes through Barnet Levey (or Levy, 1798-1837) who came to Sydney in the 1820s to visit his brother. When he saw how prosperous the city was becoming, Levey decided to settle here and set up a business as a general merchant. In 1831 he was granted 60 acres in the area bounded by the present Old South Head Road, Birrell Street, Paul Street and Hollywood Avenue. He must have occupied the land before the official grant because he built himself a substantial two story home on Old South Head Road in 1827, naming it Waverley House after the book by his favourite author. As time passed the house became a distinctive landmark and gave its name to the surrounding district, which was simply called Waverley. Levey established Sydney's first permanent theatre behind his shop in George Street. His projects consumed all his money, and when he died in 1837 he left a widow and four children in poverty. In 1837 the house was taken over for a Catholic school or orphanage, but it was demolished early in the 20th century.

Waverley municipality was proclaimed in 1859. By the 1880s trams were running to the beaches in the Eastern Suburbs and Waverley became a popular picnic spot. Waverley Park had a splendid oval, used by the established Waverley District Cricket Club.

Waverley Cemetery was established in 1877 on the site of the old tram terminus, on a beautiful site near the ocean. It houses many historically notable people.

The 1866 NSW Gazetteer described Waverley as having Clough's Windmill, Allan's Soap Works, Dickson's Soap and Candle Works and Scott's Blacking and Fireworks Factory. There were also four quarries producing excellent freestone. Today however, it is an attractive residential suburb, just west of Tamarama Beach (Pollen & Healy, 1988, 266-7)

Bondi Sewer System:
By 1859 Sydney's sewerage system consisted of five outfall sewers which drained to the Harbour. By the 1870's, the Harbour had become grossly polluted and an alternative means of disposing of the city's sewage was investigated. This led to the construction of the Main Northern Ocean Outfall Sewer and a southern sewer draining to a sewage farm at Botany Bay.

The Main Northern Outfall Sewer (BOOS) was the first ocean outfall sewer to be designed and built in Sydney. At the time when Melbourne was getting its first reticulated sewer, Sydney was diverting its existing sewers from Harbour outfalls to ocean outfall. It was a marvel of surveying accuracy for its time which allowed bricking to commence before breakthrough of the tunnel. This system reduced the flow into the Harbour sewers, until the introduction of the electric pumping stations. This system was instrumental in reducing the pollution entering the Harbour.

The sewer was lined with brick. It is 2.4m x 2.2m diminishing to 2.1m x 1.8m at the junction chamber at the corner of junction of Oxford and College Streets. It is from this point that the main branches extended in northerly, westerly and south-westerly directions. Two sections of the system have pitched roofs at the junction of Oxford and College Streets and also at Taylor Square. A number of engineers who worked on the system later worked on other notable landmarks such as T. Keele (President of The Water Baord in 1904) , L.A.B Wade (father of dams) and W.C.Bennett (Chief Engineer) who were also both Board Members.

It is now known that the large volume expansion chamber near the ocean was tunnelled from the ocean end so that the spoil did not need to be hauled to the surface nor trundled along the tunnel under Blair Steet. This meant that the extended tunnel could not drain out seepage water. This was dealt with by digging a side drain from Bondi across to Rose Bay to help dry out the wetland/swamp which is now a golf course. The spoil was dumped at the bottom of the cliff face. The remnants of the ladderway by which miners descended was removed c.1990.

Historic themes

Australian theme (abbrev)New South Wales themeLocal theme
1. Environment-Tracing the evolution of a continent's special environments Environment - naturally evolved-Activities associated with the physical surroundings that support human life and influence or shape human cultures. Other open space-
1. Environment-Tracing the evolution of a continent's special environments Environment - naturally evolved-Activities associated with the physical surroundings that support human life and influence or shape human cultures. Cultural - Coasts and coastal features supporting human activities-
1. Environment-Tracing the evolution of a continent's special environments Environment - naturally evolved-Activities associated with the physical surroundings that support human life and influence or shape human cultures. Changing the environment-
3. Economy-Developing local, regional and national economies Environment - cultural landscape-Activities associated with the interactions between humans, human societies and the shaping of their physical surroundings Developing local, regional and national economies-National Theme 3
3. Economy-Developing local, regional and national economies Environment - cultural landscape-Activities associated with the interactions between humans, human societies and the shaping of their physical surroundings Landscapes of institutions - productive and ornamental-
3. Economy-Developing local, regional and national economies Events-Activities and processes that mark the consequences of natural and cultural occurences Developing local landmarks-
3. Economy-Developing local, regional and national economies Health-Activities associated with preparing and providing medical assistance and/or promoting or maintaining the well being of humans Providing sewerage systems-
3. Economy-Developing local, regional and national economies Technology-Activities and processes associated with the knowledge or use of mechanical arts and applied sciences Technologies for sanitation-
4. Settlement-Building settlements, towns and cities Accommodation-Activities associated with the provision of accommodation, and particular types of accommodation – does not include architectural styles – use the theme of Creative Endeavour for such activities. Building settlements, towns and cities-National Theme 4
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Early land grants-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Changing land uses - from rural to tourist-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Granting Crown lands for private farming-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Sub-division of large estates-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Early farming (Cattle grazing)-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Administering and alienating Crown lands-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Changing land uses - from rural to suburban-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Resuming private lands for public purposes-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Subdivision of rural estates-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages 19th century suburban developments-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Suburban Consolidation-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Rural Estates-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Roadside Villages-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Suburban Expansion-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages 19th Century Infrastructure-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Creating landmark structures and places in suburban settings-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages living in the suburbs-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Shaping coastal settlement-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Shaping coastal settlement-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Impact of railways on suburban development-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Developing suburbia-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Role of transport in settlement-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Beautifying towns and villages-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Planning relationships between key structures and town plans-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Developing towns in response to topography-
4. Settlement-Building settlements, towns and cities Utilities-Activities associated with the provision of services, especially on a communal basis Water and drainage-
4. Settlement-Building settlements, towns and cities Utilities-Activities associated with the provision of services, especially on a communal basis Providing sewers and stormwater outlets-
4. Settlement-Building settlements, towns and cities Utilities-Activities associated with the provision of services, especially on a communal basis Examples of early water and sanitation systems (wells and cess pits)-
5. Working-Working Labour-Activities associated with work practises and organised and unorganised labour Working on public infrastructure projects-
5. Working-Working Labour-Activities associated with work practises and organised and unorganised labour Working in the public service-
5. Working-Working Labour-Activities associated with work practises and organised and unorganised labour Working complex machinery and technologies-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. State government-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - administering a public health system-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - building and operating public infrastructure-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - conserving cultural and natural heritage-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - administration of land-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - providing sewerage treatment-
9. Phases of Life-Marking the phases of life Persons-Activities of, and associations with, identifiable individuals, families and communal groups Associations with the NSW Department of Public Works-

Assessment of significance

SHR Criteria a)
[Historical significance]
By 1859 Sydney's sewerage system consisted of five outfall sewers which drained to the Harbour. By the 1870's, the Harbour had become grossly polluted and an alternative means of disposing of the City's sewage was investigated. This led to the construction of the Main Northern Ocean Outfall Sewer and a southern sewer draining to a sewage farm at Botany Bay.

The historical significance of the sewerage system primarily relates to its role in the growth of Sydney and suburbs and the expansion of municipal services from the from the early 1900's to the present. The construction of these systems is evidenced by the sewage pumping stations, vents and other associated works which display in their character, a gradual change in architectural style spanning the Federation, InterWar and Post War periods.
SHR Criteria c)
[Aesthetic significance]
The vast majority of the sewer is located underground. A section can be observed at the entrance to Bondi STP and at Lough Reserve in Double Bay.. It displays a high level of workmanship which is evident in the brickwork. Other features of the system include several large ornate brick sewer ventshafts at Glebe, Bellevue Hill and Bathurst Street in the city. These have substantial landmark values.
SHR Criteria d)
[Social significance]
The development of the main sewerage systems represented part of the advance in the protection of public health in Sydney by collectively reducing the discharge of sewage from Port Jackson via the city's early sewers and divert to the Pacific Ocean. As such the system is of high significance to the general community.
SHR Criteria e)
[Research potential]
Sewerage systems demonstrate a variety of construction styles ranging from sandstone blocks, solid rock and reinforced concrete. The construction of these systems contributed to our understanding of the development and use of these materials in Australia and reflects the technological change in construction to meet the increasing population of Sydney.

Bondi was a masterpiece of surveying accuracy which meant that brick lining was commenced even before tunnel "breakthrough". The Nepean Water Tunnel had been similarly completed by T.W. Keele, but being a water tunnel did not require internal brick lining.
SHR Criteria f)
[Rarity]
The sewer is unique as the first such system in Australia. Technically significant as it contains important information relating to the construction of earlier sewers.
SHR Criteria g)
[Representativeness]
Represents the first ocean outfall sewer to be built in Sydney. One of only a few oviform outfalls, but the only one discharging into the ocean.
Integrity/Intactness: Substantially Intact
Assessment criteria: Items are assessed against the PDF State Heritage Register (SHR) Criteria to determine the level of significance. Refer to the Listings below for the level of statutory protection.

Recommended management:

Manage the place and its significant components in accordance with the Heritage Council State Owned Heritage Asset Management Guidelines and the Minimum Standards of Maintenance and Repair in the NSW Heritage Regulations. Manage significant site elements in accordance with a Conservation Management Plan (CMP). If no CMP exists, consult with Asset Management Commercial Services with respect to commissioning a CMP. When commissioning a CMP, do so in accordance with the Model Brief for CMPs available on ConnectNet. Seek endorsement of the CMP from the Heritage Council of NSW. Works undertaken in accordance with a Heritage Council-endorsed CMP do not require further approval under the NSW Heritage Act. Involve heritage professionals as required under the terms of the CMP, or as otherwise determined necessary. Review CMP every 5 years or in a major change of circumstances, whichever is sooner. Review of a CMP should only be undertaken following consultation with Asset Management Commercial Services . When commissioning a CMP review, do so in accordance with the Model Brief for CMPs available on ConnectNet. Where no CMP is in place, or where works are outside the scope of the existing CMP, assess heritage impacts of proposed works in accordance with Sydney Water Environment Impact Assessment guidelines (e.g. undertake a Heritage Assessment and/or Statement of Heritage Impact as required, obtain Heritage Council approval as required). Consult with the Heritage Manager, Environment and Innovation, when major works are planned which affect items of State heritage significance. Undertake archival and photographic recording before major changes, in accordance with Heritage Council guidelines. Lodge copies of the archival record with the Sydney Water Archives and the NSW Heritage Office. Where the item is listed in a Local Environmental Plan Schedule of Heritage items, determine if works are exempt from approval under the LEP provisions. Where works are not exempt, obtain necessary approvals from the local council, in accordance with SWC EIA Guidelines.

Procedures /Exemptions

Section of actDescriptionTitleCommentsAction date
57(2)Exemption to allow workStandard Exemptions HERITAGE ACT 1977

ORDER UNDER SECTION 57(2) TO GRANT STANDARD EXEMPTIONS FROM APPROVAL

I, Penny Sharpe, the Minister for Heritage, on the recommendation of the Heritage Council of New South Wales and under section 57(2) of the Heritage Act 1977:

revoke the order made on 2 June 2022 and published in the Government Gazette Number 262 of 17 June 2022; and

grant an exemption from section 57(1) of the Act in respect of the engaging in or carrying out the class of activities described in clause 2 Schedule A in such circumstances specified by the relevant standards in clause 2 Schedule A and General Conditions in clause 3 Schedule A.

This Order takes effect on the date it is published in the NSW Government Gazette.

Dated this 29th day of October 2025
The Hon Penny Sharpe MLC
Minister for Heritage

For more information on standard exemptions click on the link below.
Nov 7 2025

PDF Standard exemptions for engaging in or carrying out activities / works otherwise prohibited by section 57(1) of the Heritage Act 1977

Listings

Heritage ListingListing TitleListing NumberGazette DateGazette NumberGazette Page
Heritage Act - State Heritage Register 0162315 Nov 02 2209709
Heritage Act - s.170 NSW State agency heritage register     

Study details

TitleYearNumberAuthorInspected byGuidelines used
Sydney Water Heritage Study1996 Graham Brooks and Associates Pty Ltd  Yes
Quakers Hat Aqueduct1999 Godden Mackay Logan  Yes
Bondi Ocean Outfall Sewer : National Trust Listing1999 J.M.Collocott  No
Alexandra Canal Conservation Management Plan2004 NSW Department of Commenrce, Heritage Design Services  Yes

References, internet links & images

TypeAuthorYearTitleInternet Links
WrittenAttenbrow, Val A pre-colonial history View detail
WrittenPollen, Frances & Healy, Gerald (ed.s & contributors)1990'Waverley' entry, in The Book of Sydney Suburbs

Note: internet links may be to web pages, documents or images.

rez rez rez rez rez
(Click on thumbnail for full size image and image details)

Data source

The information for this entry comes from the following source:
Name: Heritage NSW
Database number: 5053861


Every effort has been made to ensure that information contained in the State Heritage Inventory is correct. If you find any errors or omissions please send your comments to the Database Manager.

All information and pictures on this page are the copyright of Heritage NSW or respective copyright owners.