Sydenham Pit & Drainage Pumping Station 1

Item details

Name of item: Sydenham Pit & Drainage Pumping Station 1
Other name/s: Sydenham Stormwater Basin, Drainage Pumping Station (DPS1)
Type of item: Built
Group/Collection: Utilities - Water
Category: Other - Utilities - Water
Location: Lat: -33.9118419749 Long: 151.1686631960
Primary address: Garden Street, Marrickville, NSW 2204
Local govt. area: Inner West
Local Aboriginal Land Council: Metropolitan
Property description
Lot/Volume CodeLot/Volume NumberSection NumberPlan/Folio CodePlan/Folio Number
LOT1 DP1022910
LOT29 DP153
LOT34 DP153
LOT35 DP153
LOT40 DP153
LOT41 DP153
LOT46 DP153
LOT1 DP186276
All addresses
Street AddressSuburb/townLGAParishCountyType
Garden StreetMarrickvilleInner West  Primary Address
Shirlow StrretMarrickvilleInner West  Alternate Address

Owner/s

Organisation NameOwner CategoryDate Ownership Updated
Sydney WaterState Government 

Statement of significance:

The Sydenham Pit and Pumping Station is of historic, aesthetic and technical significance. Historically, it is the first such infrastructure built in the SWC system and is an intact and major component of the Marrickville low level stormwater drainage infrastructure that was built in response to increasing urban expansion since the 1870s in an area prone to flooding. Its large scale and labour intensive construction method of excavating the pit reflects the abundance of labour during the Great Depression and the type of public works undertaken to provide relief work for the unemployed. Aesthetically, the use of pitched dry packed ashlar sandstone walls to line the sides of the pit provides a pleasantly textured and coloured finish to the pit. It is a major landmark and dramatic component of the industrial landscape of Sydenham particularly as viewed from the railway. The pumping station is a very good example of a utilitarian building displaying Inter-War Mediterranean style architectural details. Technically, the pumping plant contains good working examples of 1930s pumps, particularly three Metropolitan Vickers pumps, and its original electrical mains equipment has been preserved insitu during upgrading in c1992.
Date significance updated: 11 Nov 00
Note: The State Heritage Inventory provides information about heritage items listed by local and State government agencies. The State Heritage Inventory is continually being updated by local and State agencies as new information becomes available. Read the Department of Premier and Cabinet copyright and disclaimer.

Description

Designer/Maker: New South Wales Public Works Department
Builder/Maker: New South Wales Public Works Department
Construction years: 1935-1941
Physical description: Sydenham Storage Pit and Pumping Station consists of two distinct parts: the pit and pumping station (albeit they are integral in operation). The pit consists of a nine metre deep basin with the sides formed into batters. The batters are faced with sandstone blocks laid horizontally in courses of about 300mm. The width of the blocks range from square to over one metre in length. The blocks are dressed on four sides with the face sparrow picked. Along the top of the stone facing wall, earth batters and an open concrete drain were formed. An access ramp to the base of the pit is located along the northern wall with entry from Railway Parade. The stone walls are penetrated by channel outlets in the southeast corner and in the centre of the western edge.The boundary of the site is planted with Oleanders. The pumping station is constructed of reinforced concrete and consists of a series of fins that rise 12 metres from the base of the pit to support the pump house that has its floor level about 1.8 metres above Railway Parade. Five concrete fins interspaced with four cylindrical concrete water shafts are incorporated, with the southern facade supported by three concrete piers joined by a horizontal cross-beam in the centre. The floor of the pumphouse overhangs the end concrete fin by about a metre and is supported by four concrete brackets. The pumphouse has the approximate internal dimensions of 7.2m wide x 17m long and 5.6m ceiling height. A switch room adjoins the eastern facade of the main pump room and has the approximate internal dimensions of 4.8m x .9m. The pumphouse has a tiled gable roof which continues down at the same pitch over the switch room. The southern and northern facades have three closely spaced vertical steel framed windows that form a square in the centre of the wall. The tops of the windows are overhung by a concrete lintel. Along the western facade of the pumphouse are five vertical windows centred on the void between the concrete fins.The building was designed in a version of the Inter-War Mediterranean domestic style.
Date condition updated:11 Nov 00
Modifications and dates: Sections of the southern and western pit walls collapsed following heavy rains and were rebuilt in the 1950's. In 1968 a concrete floor and a silt pit were installed to the base of the pit.
Current use: Stormwater pit and pumping station
Former use: Aboriginal land, farmland, stormwater pit and pumping station

History

Historical notes: Marrickville Valley: Sydenham, Tempe and Marrickville:
Sydenham was named after a London suburb, and shares like that a location close to the city and a railway junction. Like its neighbours, Tempe and Marrickville, Sydenham developed when the SYdney-Illawarra Railway line came through the area, to Hurstville (Pollen & Healy, 1988, 251).

Like Tempe, Sydenham Railway Station was built on the duplicated line from Illawarra Junction to Hurstville and opened in 1884. While under construction, the (Sydenham) station was known as Illawarra Road, but it opened on 15/10/1884 as Marrickville, and on 19/5/1895 the name was changed to Sydenham, because a new line was being built to Bankstown and the first station on the new line was to be called Marrickville. To add to the confusion, Sydenham post office was first known as Tempe Park when it opened in 1899, but in 1964 was renamed Sydenham (Pollen & Healy, 1988, 251).

Once part of the parish of Petersham, the area on which Marrickville now stands was included in some of the early grants in the colony. The first was 100 acres given to William Beckworth in 1794. In 1799 Governor Hunter made a second grant of 470 acres to THomas Moore, who 4 years later received another 700 acres from Governor King. These three grants covered most of present-day Marrickville, which is bordered in the south by the Cook's River. Dr Robert Wardell who was murdered (1834) by escaped convicts at Petersham, purchased most of this land from the grantees or their heirs and included it in his estate, which was broken up after his killing. Wardell Road commemorates him. Another man with a big influence on the suburb was Thomas Chalder. He acquired a 60 acre subdivision of land and advertised it for auction in 1855. He called it 'Marrick', after his native village in Yorkshire (England), this (with the addition of 'ville' suggested by another resident, William Dean) was adopted for the municipality when... gazetted in 1861 (Pollen & Healy, 1988, 165-6).

A landmark for many years in the suburb was the castellated mansion overlooking the Cook's River known as The Warren, built by Thomas Holt, a SYdney business tycoon who made a fortune from wool. Holt gave his home this name because he bred rabbits there for hunting. Hi sestate of about 100 acres south of Wardell's, covered the area bounded today by Unwin's Bridge, Illawarra and Warren Roads. Until the 1860 the area was covered in scrub and timber, but the 1866 NSW Gazetteer recorded that industries had been established (there): two soap and candle factories, three brickyards and a tannery. Much of the district however was laid out as market gardens, taking advantage of the fine alluvial soil. The estate of The Warren was subdivided in 1886, the buyer beginning to build his hoome, known as Ferncourt, completed in 1887. The first bridge (wooden) built over the Cooks River was by Frederick Unwin in 1836. It was replaced by a more substantial structure in 1886, and Ferncourt became a primary school. An order of French Carmelite Nuns moved into the Warren when the original owners left in 1886 (Pollen & Healy, 1988, 165-6).

Stormwater Pumping Station (1897):
With the completion of the Illawarra railway beyond Sydenham in the 1880s, the urburbanisation of the Marrickville Valley increased rapidly. It was soon found that the valley had significant drainage problems, which were partly solved by the construction of a stormwater pumping station in Carrington Road , Marrickville in 1897 (now known as Marrickville Sewage & Stormwater pumping Station - SP271) and three main stormwater channels, comprising the Eastern, Western and Central Channels.

In the 1930s the government decided to improve the drainage system, which included an allocation of unemployment relief funds for drainage works in Marrickville Muncipality. The scheme included the drainage of the northern section of the low level area north of Marrickville Road, comprising the excavation of a storage pit, the erection of a pumping station with a rising main discharging into the Eastern Channel and the construction of a system of channels discharging into the pit. The pit and pumping station were constructed by the Public Works Department in the late 1930s and transferred to the MWS &DB in 1941.

Historic themes

Australian theme (abbrev)New South Wales themeLocal theme
1. Environment-Tracing the evolution of a continent's special environments Environment - naturally evolved-Activities associated with the physical surroundings that support human life and influence or shape human cultures. Cultural: Rivers and water bodies important to humans-
1. Environment-Tracing the evolution of a continent's special environments Environment - naturally evolved-Activities associated with the physical surroundings that support human life and influence or shape human cultures. Changing the environment-
3. Economy-Developing local, regional and national economies Environment - cultural landscape-Activities associated with the interactions between humans, human societies and the shaping of their physical surroundings Developing local, regional and national economies-National Theme 3
3. Economy-Developing local, regional and national economies Environment - cultural landscape-Activities associated with the interactions between humans, human societies and the shaping of their physical surroundings Unseen but Present-
3. Economy-Developing local, regional and national economies Environment - cultural landscape-Activities associated with the interactions between humans, human societies and the shaping of their physical surroundings Landscapes of institutions - productive and ornamental-
3. Economy-Developing local, regional and national economies Health-Activities associated with preparing and providing medical assistance and/or promoting or maintaining the well being of humans (none)-
3. Economy-Developing local, regional and national economies Technology-Activities and processes associated with the knowledge or use of mechanical arts and applied sciences Technologies for flood mitigation-
3. Economy-Developing local, regional and national economies Technology-Activities and processes associated with the knowledge or use of mechanical arts and applied sciences Technologies for reticulated water supply-
4. Settlement-Building settlements, towns and cities Accommodation-Activities associated with the provision of accommodation, and particular types of accommodation – does not include architectural styles – use the theme of Creative Endeavour for such activities. Building settlements, towns and cities-National Theme 4
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Townships-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Resuming private lands for public purposes-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Changing land uses - from rural to suburban-
4. Settlement-Building settlements, towns and cities Land tenure-Activities and processes for identifying forms of ownership and occupancy of land and water, both Aboriginal and non-Aboriginal Administering and alienating Crown lands-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Developing towns in response to topography-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Developing suburbia-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Suburban Consolidation-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Suburban Expansion-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages living in the suburbs-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Shaping coastal settlement-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages 19th Century Infrastructure-
4. Settlement-Building settlements, towns and cities Towns, suburbs and villages-Activities associated with creating, planning and managing urban functions, landscapes and lifestyles in towns, suburbs and villages Creating landmark structures and places in suburban settings-
4. Settlement-Building settlements, towns and cities Utilities-Activities associated with the provision of services, especially on a communal basis Water and drainage-
4. Settlement-Building settlements, towns and cities Utilities-Activities associated with the provision of services, especially on a communal basis Providing sewers and stormwater outlets-
5. Working-Working Labour-Activities associated with work practises and organised and unorganised labour Working on public infrastructure projects-
5. Working-Working Labour-Activities associated with work practises and organised and unorganised labour Working in the public service-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. State government-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - administration of land-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Suburban Consolidation-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - conserving cultural and natural heritage-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - building and operating public infrastructure-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - providing reticulated water-
7. Governing-Governing Government and Administration-Activities associated with the governance of local areas, regions, the State and the nation, and the administration of public programs - includes both principled and corrupt activities. Developing roles for government - public water supply-
8. Culture-Developing cultural institutions and ways of life Creative endeavour-Activities associated with the production and performance of literary, artistic, architectural and other imaginative, interpretive or inventive works; and/or associated with the production and expression of cultural phenomena; and/or environments that have inspired such creative activities. Monuments-
8. Culture-Developing cultural institutions and ways of life Creative endeavour-Activities associated with the production and performance of literary, artistic, architectural and other imaginative, interpretive or inventive works; and/or associated with the production and expression of cultural phenomena; and/or environments that have inspired such creative activities. Industrial buildings-
8. Culture-Developing cultural institutions and ways of life Creative endeavour-Activities associated with the production and performance of literary, artistic, architectural and other imaginative, interpretive or inventive works; and/or associated with the production and expression of cultural phenomena; and/or environments that have inspired such creative activities. Landscaping - 20th century interwar-
8. Culture-Developing cultural institutions and ways of life Creative endeavour-Activities associated with the production and performance of literary, artistic, architectural and other imaginative, interpretive or inventive works; and/or associated with the production and expression of cultural phenomena; and/or environments that have inspired such creative activities. Technological innovation and design solutions-
8. Culture-Developing cultural institutions and ways of life Creative endeavour-Activities associated with the production and performance of literary, artistic, architectural and other imaginative, interpretive or inventive works; and/or associated with the production and expression of cultural phenomena; and/or environments that have inspired such creative activities. Landscaping - Federation period-
8. Culture-Developing cultural institutions and ways of life Creative endeavour-Activities associated with the production and performance of literary, artistic, architectural and other imaginative, interpretive or inventive works; and/or associated with the production and expression of cultural phenomena; and/or environments that have inspired such creative activities. Building in response to natural landscape features.-
9. Phases of Life-Marking the phases of life Persons-Activities of, and associations with, identifiable individuals, families and communal groups Associations with the NSW Department of Public Works-

Assessment of significance

SHR Criteria a)
[Historical significance]
Sydenham Storage Pit and Pumping Station is of historical significance, being the first such infrastructure in the SWC system and an intact element and major component of the Marrickville low level stormwater infrastucture that was built in response to increasing urban expansion since the 1870s in an area prone to flooding. It is a major landmark and dramatic component of the industrial landscape of Sydenham particularly as viewed from the railway. Its construction, comprising large scale labour intensive methods reflects the type of public works undertaken to provide depression relief work during the 1930s.
SHR Criteria c)
[Aesthetic significance]
The use of pitched ashlar sandstone walls to line the sides provides a pleasantly textured and coloured finish to the pit. The pumping station is a very good example of a utilitarian building designed in the Inter War Mediterranean Revival style, exploiting the use of architectural details associated with the style, including a tiled gable roof, tiled barge and pronounced lintels.
SHR Criteria d)
[Social significance]
Item does not have any notable outstanding social values.
SHR Criteria e)
[Research potential]
The pumping plant contains good working examples of 1930s pumps. The three Metropolitan Vickers pumps in particular are considered rare in the region. It maintains insitu evidence of the original electrical mains.
SHR Criteria f)
[Rarity]
The Sydenham Pit and Draniage Pumping Station 1 is one of only two such installations in the SWC system and is one of the largest and most visible examples of a stormwater retention facility in Sydney.
SHR Criteria g)
[Representativeness]
The pumping station is a representative example of Inter War Mediterranean Revival style public utility building.
Integrity/Intactness: Substantially intact.
Assessment criteria: Items are assessed against the PDF State Heritage Register (SHR) Criteria to determine the level of significance. Refer to the Listings below for the level of statutory protection.

Recommended management:

Manage the place and its significant components in accordance with the Heritage Council State Owned Heritage Asset Management Guidelines and the Minimum Standards of Maintenance and Repair in the NSW Heritage Regulations. Manage significant site elements in accordance with a Conservation Management Plan (CMP). If no CMP exists, consult with Asset Management Commercial Services with respect to commissioning a CMP. When commissioning a CMP, do so in accordance with the Model Brief for CMPs available on ConnectNet. Seek endorsement of the CMP from the Heritage Council of NSW. Works undertaken in accordance with a Heritage Council-endorsed CMP do not require further approval under the NSW Heritage Act. Involve heritage professionals as required under the terms of the CMP, or as otherwise determined necessary. Review CMP every 5 years or in a major change of circumstances, whichever is sooner. Review of a CMP should only be undertaken following consultation with Asset Management Commercial Services . When commissioning a CMP review, do so in accordance with the Model Brief for CMPs available on ConnectNet. Where no CMP is in place, or where works are outside the scope of the existing CMP, assess heritage impacts of proposed works in accordance with Sydney Water Environment Impact Assessment guidelines (e.g. undertake a Heritage Assessment and/or Statement of Heritage Impact as required, obtain Heritage Council approval as required). Consult with the Heritage Manager, Environment and Innovation, when major works are planned which affect items of State heritage significance. Undertake archival and photographic recording before major changes, in accordance with Heritage Council guidelines. Lodge copies of the archival record with the Sydney Water Archives and the NSW Heritage Office. Where the item is listed in a Local Environmental Plan Schedule of Heritage items, determine if works are exempt from approval under the LEP provisions. Where works are not exempt, obtain necessary approvals from the local council, in accordance with SWC EIA Guidelines.

Recommendations

Management CategoryDescriptionDate Updated
Recommended ManagementProduce a Conservation Management Plan (CMP) 
Recommended ManagementPrepare a maintenance schedule or guidelines 
Recommended ManagementCarry out interpretation, promotion and/or education 

Procedures /Exemptions

Section of actDescriptionTitleCommentsAction date
CMP-EndorseConservation Plan submitted for endorsementSydenham Pit & Drainage Pumping Station 1 CMP, by Sydney Water for Sydney Water, dated September 2004 CMP received for review and endorsement 13 September 2004  
57(2)Exemption to allow workStandard Exemptions HERITAGE ACT 1977

ORDER UNDER SECTION 57(2) TO GRANT STANDARD EXEMPTIONS FROM APPROVAL

I, Penny Sharpe, the Minister for Heritage, on the recommendation of the Heritage Council of New South Wales and under section 57(2) of the Heritage Act 1977:

revoke the order made on 2 June 2022 and published in the Government Gazette Number 262 of 17 June 2022; and

grant an exemption from section 57(1) of the Act in respect of the engaging in or carrying out the class of activities described in clause 2 Schedule A in such circumstances specified by the relevant standards in clause 2 Schedule A and General Conditions in clause 3 Schedule A.

This Order takes effect on the date it is published in the NSW Government Gazette.

Dated this 29th day of October 2025
The Hon Penny Sharpe MLC
Minister for Heritage

For more information on standard exemptions click on the link below.
Nov 7 2025

PDF Standard exemptions for engaging in or carrying out activities / works otherwise prohibited by section 57(1) of the Heritage Act 1977

Listings

Heritage ListingListing TitleListing NumberGazette DateGazette NumberGazette Page
Heritage Act - State Heritage Register 0164415 Nov 02 2209709
Heritage Act - s.170 NSW State agency heritage register     

Study details

TitleYearNumberAuthorInspected byGuidelines used
Alexandra Canal Conservation Management Plan2004 NSW Department of Commenrce, Heritage Design Services  Yes

References, internet links & images

TypeAuthorYearTitleInternet Links
WrittenPollen, Frances (ed.) and Healy, Gerald1988'Tempe', 'Sydenham' and 'Marrickville' entries

Note: internet links may be to web pages, documents or images.

rez rez rez
(Click on thumbnail for full size image and image details)

Data source

The information for this entry comes from the following source:
Name: Heritage NSW
Database number: 5053883
File number: H05/00092


Every effort has been made to ensure that information contained in the State Heritage Inventory is correct. If you find any errors or omissions please send your comments to the Database Manager.

All information and pictures on this page are the copyright of Heritage NSW or respective copyright owners.